PROJECT |
ROH1 IN AMENAS PIPELINE REHABILITATION PROJECT |
DESCRIPTION |
The project consists of the engineering, supply and construction of 66,000 m of 24 ” Fiberglass Tubes (GRE), for the Replacement of a section of the ROH1 / 30” pipeline, for corrosion purposes, from SP1 in Amenas PK00 to PK 66, along with required pipeline stations. |
CLIENT |
SONATRACH |
LOCATION |
ALGERIA |
SCOPE OF SERVICES |
Feasibility Study, Pipeline material selection, Pipeline right of way, Basic Design, Detailed Engineering, Construction Follow Up |
COMMENCING DATE |
2024 |
COMPLETION DATE |
2025 |