EL SHARARA DEVELOPMENT PROJECT – ZAWIA TERMINAL

PROJECT EL SHARARA DEVELOPMENT PROJECT – ZAWIA TERMINAL
DESCRIPTION New Terminal Facilities in Zawia, Libya, comprising of :
Receiving traps for the 30” and 18” pipelines
Floating roof crude oil storage tanks (9 No., 300,000 bbl. each)
Crude load-out transfer pumps (7 No. Pumps)
Load-out meters (6 No.)
Refinery feed meters (4 No.)
Piping, manifolds, etc.
Instrumentation and control systems
Firefighting facilities, utilities, buildings, etc.
CLIENT J&P – REPSOL
CLIENT LOCATION LIBYA
SCOPE OF SERVICES Basic Design
Detailed Engineering
Process
Civil
Machinery
Technological
Piping
Electrical
Instrumentation
Procurement Services
COMMENCING DATE
COMMENCING COMPLETION DATE