
| PROJECT | 10TH RAMADAN WATER PROJECT |
| DESCRIPTION | “Design and construction of 10th Ramadan intake booster station and transmission Lines: 2 pipelines (2500m each) to carry 1.2 million m3/day” |
| CLIENT | Arab Contractors |
| LOCATION | EGYPT |
| SCOPE OF SERVICES | Detailed engineering: Hydraulic, Mechanical, Structural, Control, Monitoring, Water Hammer calculations |
| COMMENCING DATE | 2010 |
| COMPLETION DATE | 2011 |