PROJECT | 10TH RAMADAN WATER PROJECT |
DESCRIPTION | “Design and construction of 10th Ramadan intake booster station and transmission Lines: 2 pipelines (2500m each) to carry 1.2 million m3/day” |
CLIENT | Arab Contractors |
CLIENT LOCATION | EGYPT |
SCOPE OF SERVICES | Detailed engineering: Hydraulic, Mechanical, Structural, Control, Monitoring, Water Hammer calculations |
COMMENCING DATE | 2010 |
COMMENCING COMPLETION DATE | 2011 |